Q80.The optimal assignment for the given assignment problem is: Job × Machine cost matrix: Job 1 = (5, 7, 9), Job 2 = (14, 10, 12), Job 3 = (15, 13, 16).
Correct answer: 1 → I, 2 → III, 3 → II